11-9-08 Sightings

Started by triplecrownservice, November 09, 2008, 08:35:26 PM

Previous topic - Next topic

triplecrownserviceTopic starter

AT LOGANSPORT, INDIANA:

I56  8:53  ROADRAILER  EASTBOUND
7642NS (ES40DC F GEVO HORSEHEAD)

I63  10:01  ROADRAILER  WESTBOUND
2550NS (SD70 F)

260  10:46  ROADRAILER  EASTBOUND
9416NS (C40-9W F)

255  12:11  ROADRAILER  WESTBOUND
9411NS (C40-9W F)
9284NS (C40-9W F)

15E  1:07  FREIGHT  WESTBOUND
8341NS (C40-8W F CR PAINT)
8715NS (C40-8 R)

AT THIS POINT THE MOW CREW GOT OUT TO DO THEIR TIE REPLACEMENT BETWEEN LOGANSPORT AND PERU, IN. THEY WERE ORIGINALLY GOING TO GET AN 8 HOUR WORK WINDOW, BUT THE DISPATCHER HAD TO RUN 3 TRIPLECROWN TRAINS. THAT OBVIOUSLY GREW INTO 4 TRIPLECROWNS AND A FREIGHT. LAST I HEARD WAS TRACK TIME FOR 6 HOURS.

TRIPLECROWN